PROJECTS

KNM ENGINEERING an ISO 9001:2015 CERTIFIED COMPANY strives to satisfy our esteemed clients, by providing quality fabrication and meeting all machining needs of the ever increasing demands of the Industrial Engineering field in the UAE.

SOUNBULA MILLS
LOCATION : JABEL ALI

FLAMMABLE LIQUID STORAGE TANK FARM 6X1500 M3.

Installation of TANKER FILLING STATION.

Time taken to complete the entire project :08 MONTHS (Including Pipeline)

ANSOL GULF FZE
LOCATION : JAFZA

FLAMMABLE LIQUID STORAGE TANK FARM 6X1500 M3.

Installation of TANKER FILLING STATION.

Time taken to complete the entire project :08 MONTHS (Including Pipeline)

AL DHAFRA PAPER MILLS 
LOCATION : ABU DHABI PROJECT – EFFLUENT TREATMENT PLANT
  • Equalisation Tank – 583 m3
  • Leaser Tank 1 – 4830 m3 (Height – 5m)
  • Leaser Tank 2 – 4830 m3 (Height – 5m)
  • Holding Tank 1 – 150 m3
  • Holding Tank 2 – 60 m3
  • Sludge sump – 116 m3
  • Treated water Tank – 50 m3
  • Buffer Tank plus Gas Holder – 735 m3
  • Degasifier – 735 m3 (Height – 1m)
GULF PROCESSING LOCATION :Dubai DIP

Capacity : 60m3 with 2 partition

Stainless Steel Cladded