SOUNBULA MILLS
LOCATION : JABEL ALI
FLAMMABLE LIQUID STORAGE TANK FARM 6X1500 M3.
Installation of TANKER FILLING STATION.
Time taken to complete the entire project :08 MONTHS (Including Pipeline)
ANSOL GULF FZE
LOCATION : JAFZA
FLAMMABLE LIQUID STORAGE TANK FARM 6X1500 M3.
Installation of TANKER FILLING STATION.
Time taken to complete the entire project :08 MONTHS (Including Pipeline)
AL DHAFRA PAPER MILLS
LOCATION : ABU DHABI PROJECT – EFFLUENT TREATMENT PLANT
- Equalisation Tank – 583 m3
- Leaser Tank 1 – 4830 m3 (Height – 5m)
- Leaser Tank 2 – 4830 m3 (Height – 5m)
- Holding Tank 1 – 150 m3
- Holding Tank 2 – 60 m3
- Sludge sump – 116 m3
- Treated water Tank – 50 m3
- Buffer Tank plus Gas Holder – 735 m3
- Degasifier – 735 m3 (Height – 1m)
GULF PROCESSING LOCATION :Dubai DIP
Capacity : 60m3 with 2 partition
Stainless Steel Cladded